How Long Does It Take to Produce a Hammock Order from China?

Short answer: a sample takes 7 days, and a bulk hammock order takes 45–50 days. Plan your order around those two numbers, and confirm the start point of each stage when you send your inquiry.

If you are a distributor or retailer planning a hammock line for next season, lead time is usually the first thing to lock in — before price, before packaging. Here is how the timeline normally works with us, and what can move it.

The timeline in four stages

1. Inquiry and quotation. Send your specifications — model, fabric, colour, logo and packaging requirements — and we reply with a quotation. The clearer your brief, the faster this stage goes. A vague “send me your catalogue” takes longer than a brief that names the model.

2. Sample: 7 days. We make a sample to your specifications so you can check the fabric, the stitching, the colour and the fit before committing to bulk. If you need changes after seeing the sample, the revision adds time — so approve the sample carefully, and confirm every detail in writing.

3. Bulk production: 45–50 days. Once the sample is approved, bulk production takes 45–50 days. This covers cutting, sewing, assembly and packing for your order.

4. Quality check before shipment. Orders are checked with our long-term third-party QC partner before they leave. Build this into your plan rather than treating it as an extra — it is the step that catches problems while they can still be fixed.

What can delay an order

  • Late sample approval. Production cannot start until the sample is confirmed. Every day the sample waits is a day the delivery date moves.
  • Custom fabric or colour. A standard fabric and colour moves fastest. A custom-dyed fabric or a new print needs extra time at the mill.
  • Unconfirmed artwork. Logo files that arrive late, or in the wrong format, hold up the sample stage. Send print-ready artwork with your inquiry if you can.
  • Order size. A trial order and a full container do not take the same time. Tell us your quantity early so the schedule is realistic.

How to plan backwards from your selling season

Work backwards from the date the hammocks need to be on your shelf, and allow time for sea freight after production. As a rule of thumb, start the conversation at least three months before you need the stock — that leaves room for the sample stage, one revision if needed, production, QC and shipping. You can see the models this timeline applies to in our hammock with stand, double hammock and camping hammock ranges.

What to ask any hammock supplier

Before you place an order, ask for the sample time and the bulk lead time in writing, and ask what the bulk lead time counts from — sample approval or deposit. A supplier who cannot give you both numbers clearly is a supplier whose delivery date you cannot plan around.

Planning a hammock order? Request a quote and we will confirm the timeline for your model and quantity.

Register Our Newsletter

For outdoor leisure products line reports, new products,catalogue etc.news updated.

Ask For A Quick Quote

We will contact you within 1 working day, please pay attention to the email with the suffix “@jauntyleisure.com”.